Every Lot.
Verified.
Your next product deserves a supplier that proves it in data, not promises.
Units Shipped Annually
PCBA · Connectors · Power Modules
First-Pass Yield
IPC-A-610 Class II/III standard
ISO Certifications Held
9001 · 14001 · 45001
Prototype Turnaround
NPI to functional sample
Active SKUs Managed
Under live vendor programs

Quality System Specifications
Quality
Systems
Every board that ships has passed automated optical inspection, X-ray, and in-circuit test. No sampling. No exceptions.
Vendor Audit Checklist
ISO 9001:2015 Certificate on file
Cert #QMS-2024-0447 · Valid through Dec 2026
IPC-A-610 Class III workmanship standard
All operators CIS-certified quarterly
Statistical Process Control (SPC) active on all lines
Cpk ≥ 1.67 maintained across critical processes
In-line AOI + X-ray on every board
SAKI BF-X3 · 100% coverage, no sampling
Corrective Action Response < 24hr
8D format, root cause with fishbone analysis
Annual third-party quality audit
Bureau Veritas · Last audit: November 2025
Component
Traceability
A recall doesn't care about lot sampling. We maintain serial-level traceability so you can isolate any affected unit within hours, not weeks.
Traceability Audit Checklist
Lot-level traceability to manufacturer date code
Every reel logged at incoming inspection
Authorized distributor-only sourcing policy
Arrow, Avnet, Mouser, Digi-Key · No grey market
Certificate of Conformance on every shipment
Manufacturer CoC + SupplierBench QC sign-off
Counterfeit part prevention program (AS6081)
Visual inspection + electrical verification on all ICs
Serialized build records retained 10 years
Accessible via secure customer portal within 24hr
Full BOM traceability report on request
Includes date codes, lot numbers, distributor invoices

Traceability System Specs
COMPONENT FLOW

Scale Capabilities
TYPICAL RAMP TIMELINE
DFM
Day 1
Review
Proto
72hr
≤50 units
Pilot
Wk 3
250 units
Mass
Wk 8
Full rate
Prototype
to Scale
One CM relationship from day-one prototype to Series C production run. No re-quoting, no re-qualification, no new account setup when you hit volume.
Scale Readiness Checklist
Prototype-to-production on single PO
No re-quoting required at volume milestones
72-hour NPI turnaround for ≤50 units
Includes DFM review and first-article inspection
DFM report delivered before first build
Covers tombstoning risk, pad geometry, BGA escape routing
Dedicated NPI engineer assigned per program
Single point of contact from Gerber to golden sample
Volume flex from 50 to 500K units/year
Three SMT lines · 24/5 operation · Weekend surge available
Consignment and turnkey both supported
Partial consignment accepted · BOM gap-fill at cost + 5%
Compliance
& Testing
Regulatory compliance isn't a checkbox we fill out once. It's a documented, auditable, continuously maintained program — with certificates you can attach to your own submissions.
Compliance Audit Checklist
RoHS 3 (EU 2015/863) full compliance
Lead-free solder · HAL-LF, ENIG, ENEPIG finishes available
REACH SVHC substance declaration on file
Updated annually · Available in 48hr on request
UL 508A panel shop certification
Industrial control panel assembly included
IPC-J-STD-001 soldering process certification
Class III process with nitrogen reflow available
ITAR-compliant secure storage available
Controlled-access cage · Personnel screening on file
In-house EMC pre-compliance testing
Near-field scan + conducted emissions · FCC/CE scope

Certifications & Standards
HELD CERTIFICATIONS
Your Procurement
Homework.
Done.
The Supplier Audit Kit bundles everything your team needs to complete a vendor qualification in a single afternoon — not three email threads and two weeks of follow-up.
What's in the kit
Blank Vendor Scorecard Template
Excel + Google Sheets · 47 audit criteria
SupplierBench Completed Scorecard
Our own answers, pre-filled and verified
ISO Certificates (ISO 9001, 14001, 45001)
Current · Bureau Veritas issued
Sample PPAP Package (redacted)
Real customer PPAP · All PII removed
Secondary Path — No Form Required
Not ready to download yet? Request access to our 18-minute Factory Virtual Tour — shot on our SMT floor, ICT station, and shipping dock.
Download Supplier Audit Kit
Get the complete qualification package
Scorecard · ISO Certs · PPAP Sample · 4 documents total
847
Downloads this quarter
4.9★
Avg. kit usefulness rating
<2min
Avg. form completion time