Every Lot.
Verified.

Your next product deserves a supplier that proves it in data, not promises.

0M+

Units Shipped Annually

PCBA · Connectors · Power Modules

0.0%

First-Pass Yield

IPC-A-610 Class II/III standard

0

ISO Certifications Held

9001 · 14001 · 45001

0hr

Prototype Turnaround

NPI to functional sample

0+

Active SKUs Managed

Under live vendor programs

Data as of Q1 2026 · Independent audit by Bureau Veritas
ISO 9001IPC-A-610IATF 16949
Scroll to audit
SMT Assembly
Through-Hole
PCBA Testing
ICT & FCT
Box Build
Cable Harness
DFM Review
NPI Support
Conformal Coating
X-Ray Inspection
AOI
BGA Rework
Component Sourcing
Kanban Fulfillment
SMT Assembly
Through-Hole
PCBA Testing
ICT & FCT
Box Build
Cable Harness
DFM Review
NPI Support
Conformal Coating
X-Ray Inspection
AOI
BGA Rework
Component Sourcing
Kanban Fulfillment
Audit Criterion 1 of 4
SMT assembly line with automated optical inspection equipment in a cleanroom environment
AOI ACTIVE100% COVERAGE

Quality System Specifications

DEFECT_RATE0.3 DPPM
FIRST_PASS_YIELD99.7%
SPC_CPK_MIN1.67
AOI_COVERAGE100% (no sampling)
CERT_BODYBureau Veritas
LAST_AUDITNov 2025 · Zero majors
Data from redacted customer PPAP · Q4 2025Download PPAP sample →

Quality
Systems

Every board that ships has passed automated optical inspection, X-ray, and in-circuit test. No sampling. No exceptions.

Vendor Audit Checklist

ISO 9001:2015 Certificate on file

Cert #QMS-2024-0447 · Valid through Dec 2026

IPC-A-610 Class III workmanship standard

All operators CIS-certified quarterly

Statistical Process Control (SPC) active on all lines

Cpk ≥ 1.67 maintained across critical processes

In-line AOI + X-ray on every board

SAKI BF-X3 · 100% coverage, no sampling

Corrective Action Response < 24hr

8D format, root cause with fishbone analysis

Annual third-party quality audit

Bureau Veritas · Last audit: November 2025

0/6 verified
Audit Criterion 2 of 4

Component
Traceability

A recall doesn't care about lot sampling. We maintain serial-level traceability so you can isolate any affected unit within hours, not weeks.

Traceability Audit Checklist

Lot-level traceability to manufacturer date code

Every reel logged at incoming inspection

Authorized distributor-only sourcing policy

Arrow, Avnet, Mouser, Digi-Key · No grey market

Certificate of Conformance on every shipment

Manufacturer CoC + SupplierBench QC sign-off

Counterfeit part prevention program (AS6081)

Visual inspection + electrical verification on all ICs

Serialized build records retained 10 years

Accessible via secure customer portal within 24hr

Full BOM traceability report on request

Includes date codes, lot numbers, distributor invoices

0/6 verified
Electronic components on circuit board with barcode labels for traceability tracking
LOT TRACKEDAS6081

Traceability System Specs

TRACKING_LEVELSerial (not lot sampling)
RECORD_RETENTION10 years
RETRIEVAL_SLA< 24 hours
SOURCE_POLICYAuth. dist. only
COUNTERFEIT_STDAS6081 compliant
PORTAL_ACCESSSecure · 24/7

COMPONENT FLOW

Mfr → Auth Dist→ Incoming QC→ Line Kitting→ SMT Build→ Test→ Ship
Audit Criterion 3 of 4
Electronics manufacturing line showing SMT placement machines in operation for prototype and production runs
3 SMT LINES24/5 OPS

Scale Capabilities

NPI_TURNAROUND72 hours
MIN_ORDER_QTY1 unit (NPI)
MAX_ANNUAL_VOL500K units/year
SMT_LINES3 lines · FUJI NXT III
COMPONENT_PITCH01005 capable
PANEL_SIZE_MAX510 × 460 mm

TYPICAL RAMP TIMELINE

DFM

Day 1

Review

Proto

72hr

≤50 units

Pilot

Wk 3

250 units

Mass

Wk 8

Full rate

Prototype
to Scale

One CM relationship from day-one prototype to Series C production run. No re-quoting, no re-qualification, no new account setup when you hit volume.

Scale Readiness Checklist

Prototype-to-production on single PO

No re-quoting required at volume milestones

72-hour NPI turnaround for ≤50 units

Includes DFM review and first-article inspection

DFM report delivered before first build

Covers tombstoning risk, pad geometry, BGA escape routing

Dedicated NPI engineer assigned per program

Single point of contact from Gerber to golden sample

Volume flex from 50 to 500K units/year

Three SMT lines · 24/5 operation · Weekend surge available

Consignment and turnkey both supported

Partial consignment accepted · BOM gap-fill at cost + 5%

0/6 verified
Audit Criterion 4 of 4

Compliance
& Testing

Regulatory compliance isn't a checkbox we fill out once. It's a documented, auditable, continuously maintained program — with certificates you can attach to your own submissions.

Compliance Audit Checklist

RoHS 3 (EU 2015/863) full compliance

Lead-free solder · HAL-LF, ENIG, ENEPIG finishes available

REACH SVHC substance declaration on file

Updated annually · Available in 48hr on request

UL 508A panel shop certification

Industrial control panel assembly included

IPC-J-STD-001 soldering process certification

Class III process with nitrogen reflow available

ITAR-compliant secure storage available

Controlled-access cage · Personnel screening on file

In-house EMC pre-compliance testing

Near-field scan + conducted emissions · FCC/CE scope

0/6 verified
Electronics testing equipment in laboratory environment with oscilloscopes and compliance testing instruments
RoHS 3REACHUL 508A

Certifications & Standards

ISO_9001Current · BV certified
ISO_14001Current · Environmental
ROHS_STATUSFull EU 2015/863
SOLDER_STDJ-STD-001 Class III
EMC_TESTINGIn-house pre-compliance
ITAR_READYControlled storage avail.

HELD CERTIFICATIONS

ISO 9001:2015ISO 14001:2015ISO 45001:2018IPC-A-610 CISJ-STD-001 CISUL 508AAS6081RoHS 3

Your Procurement
Homework.
Done.

The Supplier Audit Kit bundles everything your team needs to complete a vendor qualification in a single afternoon — not three email threads and two weeks of follow-up.

What's in the kit

📋

Blank Vendor Scorecard Template

Excel + Google Sheets · 47 audit criteria

SupplierBench Completed Scorecard

Our own answers, pre-filled and verified

📄

ISO Certificates (ISO 9001, 14001, 45001)

Current · Bureau Veritas issued

🔬

Sample PPAP Package (redacted)

Real customer PPAP · All PII removed

Secondary Path — No Form Required

Not ready to download yet? Request access to our 18-minute Factory Virtual Tour — shot on our SMT floor, ICT station, and shipping dock.

Download Supplier Audit Kit

Get the complete qualification package

Scorecard · ISO Certs · PPAP Sample · 4 documents total

No spam. No SDR follow-up unless you request it.
Unsubscribe any time.

847

Downloads this quarter

4.9★

Avg. kit usefulness rating

<2min

Avg. form completion time